Five wire beading machine technology and safe operation

Text: [Big] [middle][small] Release date: 2014-3-11  Views: 570

In the production process of metal pipe, five wire beading machine because of light weight, convenient, mobile, especially suitable for ventilation pipeline, while the production process of the pipe, in order to achieve the production process of satisfaction, in order to achieve the effect of satisfaction, in order to enable customers to use it.

A, below we talk about some production using points of attention:

1 the thickness of the plate to meet the technological requirements, if too thick will easily lead to bending load beading machine through the large, caused by the fault of machine, so Bo Zeyi caused the pipeline cracks, wrinkling phenomenon.

2 we all know the daily life used in the thickness of the sub pipeline, pipeline too thick or too thin is not processing, general pipeline shall not be less than the minimum perimeter around 30mm, so as to avoid the beading machine for sealing action of the resistance is too large, so that the plate in the forming of rollers slip and accelerate wear roller forming part of the.

4 roller diameter clearance distance should be adjusted properly, the gap is too small, it will cause the feed on the laborious, but after molding is easy to crack; gap is too large, easy to cause the pipeline joint forming irregular, but also make the plate in the forming roller slippage between, resulting in decreased efficiency.

Two, five wire beading machine safety operation

1 rib pressing machine must complete the rainproof measures, installation should be installed in a firm place, so as to avoid the operation and cause safety accident.

2 rib pressing machine before starting work inspection work must not be less, we need to check each fastener without loosening, after inspection without abnormal phenomena in order to boot.

2 rib pressing machine before starting work inspection work must not be less, we need to check each fastener without loosening, after inspection without abnormal phenomena in order to boot.

3 at the beginning of the formal work, also need a test operation process, the time to carefully to see whether the abnormal phenomenon.

4 in the process of formal, we need to check the installation of the upper roller and the lower mold. When in use, if it is found that the death card or not flexible phenomenon must be stopped to check.

5 in the processing after the completion of the cleaning work is very important, on the one hand for their own work environment improved, moreover is also very important for machine maintenance.

We do not look down upon the operation of a link in every, is the importance of safety, we must bear in mind. Ma'anshan Guohua Machinery Co., Ltd. in


In the hot line: 400-0050-408

Tel: 0555-6761239:

Tel: 0555-6769286:

Phone: 13955566238 18155562333 contact: Shi Xiangwei (General Manager):

In the post code: 243131

Address: West Industrial Park in Ma'anshan City Bowang District

E-mail: 191887144@qq.com